A structural opening was formed in a wall and a sliding door installed and finished, making good the wall on both sides of the new frame.
The work shown in this photograph
This photograph shows a sliding door fitted into a newly formed opening, with the surrounding wall made good on both faces. Forming an opening in a load-bearing wall is not a task that can be picked up as a finishing job, and the work shown here was carried out as part of a wider repair to the property.
The sequence starts with making the area safe and confirming what the wall is carrying. Where the opening affects a structural element, a structural engineer assesses the wall and designs the support around the new opening, so the load that used to run through the wall is transferred safely to the new head and cill. Only then is the opening formed and the frame installed.
A sliding door is chosen as often for its practical reasons as its appearance. It needs no swing space in a small room, it keeps the opening clear in a tight corridor, and in a flat or maisonette it can turn a limited width of wall into a usable connection between two spaces without taking floor area away from the room itself.
For a homeowner, a managing agent or a landlord, the important part is what happens to the wall once the door is in. Making good the reveals, the head, the cill and both faces of the wall is what turns an opening into a finished installation, and it is where a great deal of the tidiness of the job is judged. We complete and clean the surrounding area before we leave.
Scope of work
What's included
Make-safe of the affected area and assessment of the existing wall
Structural assessment and support design where the opening affects a load-bearing wall
Forming of the structural opening to the required size
Installation, levelling and securing of the frame and sliding leaf
Making good of the reveals, cill, head and both wall faces
Full clean-down and removal of waste from the work area on completion
Our approach
How we work on this
01
Callback and dispatch
We call you back within 15 minutes to confirm attendance, and confirm access, authority and any purchase order arrangements before the team travels.
02
Make-safe and assessment
The area is made safe and the wall is assessed, with a structural engineer involved wherever the opening affects load-bearing construction.
03
Exact price quoted
The scope of the opening, installation and making-good work is confirmed and priced in advance, before any cutting or demolition takes place.
04
The work and a tidy finish
The opening is formed, the door installed and the surrounding wall made good, with a full clean-down before the team leaves.
Why it matters
What this work means for the property
The practical difference this job makes to the people living in, managing or insuring the property.
Support designed for the new opening
Load is transferred properly around the opening rather than relying on the existing wall to carry it.
No lost floor space
A sliding leaf gives you a full-width opening without a door swinging into the room.
Walls made good on both sides
The reveals, cill and both wall faces are finished properly, so the installation looks deliberate from either room.
Clear answers
Sliding Door Installation FAQs
Can you form an opening in a load-bearing wall?
Yes, but the wall has to be assessed first. Where the opening affects a structural element, a structural engineer determines the support required around the opening before the work is carried out.
Will the wall need decorating afterwards?
We make good the reveals, the head, the cill and the wall faces either side of the frame, so the area is ready for a final coat of paint. If you would prefer us to complete that final decoration, we can include it in the scope.
How long does the installation take?
The work is usually completed across a small number of visits: making the area safe and assessing the wall, forming the opening and installing the frame, then making good and finishing the surrounding surfaces.
Speak to the team
Need a similar repair carried out?
Call our incident desk and we will confirm attendance, access and the exact price before any work begins.